Tuesday, September 28, 2010
Monday, September 27, 2010
Not Much
That's all I have to show for days and days of knitting. Remind me next time that I don't want to use cables for a sweater. I don't have pictures of the failures. Sorry. The fact is, I'm not even fully satisfied with the "success." I've knit the neckband four times in four different ways now. I think it was four times. It might be more. In between completely reknitting it, I've dropped stitches down and tried in situ modifications.
I've finally realized that the crux of the matter isn't the neckband it self. It's the way the cables feed into the neckband. I want the left and right fronts to match, allowing for the fact that I mirror imaged the cables.
They don't. Match, that is. It looks to me like the left front has an additional row of knitting. I'm wondering if it has to do with the way you have to bind off on a right-side row for the left front and a wrong side row for the right front. That's the comforting fiction I'm going with. I've run out of ideas and I don't think I can bear to frog the neckband again.
All of the above means that I am drastically behind on my time table. I've got the sleeves blotting in towels now and will pin them out and hide them in the Princess' room this morning. The only reassuring thing is that I checked stitch and row gauge over 8 inches of knitting and came up with 39 stitches and 52 rows, which worked out to a ratio of 3 to 4, which is the ratio the stitches to rows is supposed to come out to for the button-band. Thank the knitting gods, because I have to finish the knitting today.
Now, will someone please explain why I have only 6 buttons?
Not much. My worry is that, like the buttons, it will be not enough.
Posted by
Julie McC.
at
10:34 AM
0
comments
Thursday, September 23, 2010
Impossible Dreams
If, when I first contemplated this madness, you had told me that by 9:30 this morning I would have bound off both front pieces, I would have laughed myself into a stupor. Truly, looking over this past year or so, with the notable exception of the Christmas gifts, knitting here has been more about dwelling in the realm of possibility (sounds so much nicer than slacking) than actual production. (Remind me that at some point I have to blog about the Cedar Leaf Shawlette, finished lo these many months, in the last flush of energy from all that holiday knitting.)
I have one week to block, assemble and (here' s what's got me a little panicky) knit my first button and buttonhole bands.
I can do this. I 'm pretty sure. There's at least a chance. Doing it in secret had me stymied for a bit,(I can hardly use the dining room table or our bed; it's supposed to be a surprise, remember?) but the Princess and I have conspired. I'll do it in stages to accommodate that lack of large flat surface areas. I'll do it with her blocking board, which is twice the size of mine. And I'll do it in her room (their Father having a praiseworthy respect for his children's privacy, i.e. he just about never pokes his head in there).
On the theory that the next steps are the shoulder seams, the neck band and the button and buttonhole bands -- all which require the the back and fronts -- I've got the body pieces prepping now. I've gone for wet-blocking at this stage, rather than spray and pin or hit the steam button on my iron. If I'm going to have to pick up some number plus infinity stitches, I don't want to find that I've used a skewed ratio of rows to stitches. The schedule is pretty tight. Having to do the math is bad enough. Doing it with inaccurate data is not in the cards.
The plan is that tomorrow I can finish the neckband while the sleeves are blocking. In an ideal world I'll get the stitches picked up for the front bands, too. The weekend is not an ideal time for secret knitting, but I'll see what I get through - he will take off for a run at some point. And then there's all that nap time. If he comes down with my cold that could prove extensive. With a combination of chance and careful planning (and depending on how many times I have to redo the button bands), I can finish the seaming by Wednesday and do a final blocking in time to astonish him Thursday night.
Hey. It could happen.
Posted by
Julie McC.
at
11:35 AM
1 comments
Tuesday, September 21, 2010
Friday, September 17, 2010
You Know You've Been Missing It
The return of Foolishness on Friday.
I've been an awfully good blogger ltely. I think I've earned some foolery, and this appeals to the failed Psych Major in me.
You are Energetic and Bright |
![]() You view people with optimism. You have many meaningful relationships in your life. You had more conflict with your mother than your father. Your relationship with her was healthy but challenging. You deal with stress in an effective and competent matter. You are able to remain calm. You are a natural multitasker. You enjoy being busy, even if the amount of things you need to do is overwhelming. |
Posted by
Julie McC.
at
8:41 AM
1 comments
Thursday, September 16, 2010
Wednesday, September 15, 2010
An Ace Up My Sleeve
The front (s?) of Their Father's sweater is still missing. Looking at the last photo I have of the project, it occurred to me that I may be looking for the wrong thing. I've been searching for yarn. Perhaps I should be searching for the muslin project bag with the yellow birds.
And I will. It's just that the days are slipping by. In that deep dark secret part of my brain where my knitting fantasies live, I keep envisioning giving him the sweater for his birthday, more specifically, this birthday. I know I do, because when little bits of fantasies bubble to the surface of my brain and pop open, in between the ones where I knit like Elizabeth Zimmermann, or the ones where suddenly the Blog is one of the top 200 knitting blogs and has the comments to prove it, I envision him opening a box and being astounded by the reality of his sweater.
Yes, yes, I know it's not going to happen. That's why these are fantasies. Still, my fingers are itching to work on this particular project.
I've been chasing ideas around my brain like a dog chases squirrels. I could marathon knit. People here are old enough to fend for themselves. So what if the Lord Protector will live on Flaming Hot Cheetos and the Pirate subsist entirely on birthday cake? I could double, no, quadruple my knitting speed. Hey, it could happen (and pigs may whistle but they've poor mouths for it). The sweater could knit itself, like the ones Mrs. Weasley knits (I seem to be having a hard time separating fiction from reality here). None of them, however, will work if I don't have enough yarn.
That's the crux of things. Memory is notoriously unreliable (seen Rashomon lately?). Yet my memory insists I have not one (as pictured) but both the sweater fronts started. Not knit very far, but started. It's not the loss of work that has me chewing my fingernails as if they were made out of chocolate, it's the loss of the yarn. Two sweater fronts means two full skeins of yarn. That's a lot. I could knit my fingers to the bone. I could knit so fast my needles smoke and I need to keep a fire extinguisher by my side. It won't matter if I run out of yarn.
I've been staring at my remaining supply. It's about 2.5 skeins, maybe a little more. In between wondering if I really overbought the yarn by that much, or if my doppelganger slipped in, frogged the fronts, reclaimed the yarn and wound it back into skeins, complete with manufacturer's label, I've been trying to gauge how much I've actually used so far, trying to determine if I have enough. I don't think the back took more than two skeins. Will two and a half be sufficient? I have to consider the cables. Cables eat yarn. I know each sleeve took a little more than two skeins. Will the fronts use more than that? There's a button band to consider. How much more will that need?
Well, you get the idea. All dithery I've been, when I'm not tearing apart knitting bags and stash baskets. When not occupying the forefront of my brain, it's been niggling at the back. Neither of which is actually knitting the sweater for me. Conditions were ripe for a brainstorm, and last night as I was winding up one of the remaining skeins, that's what I got.
I have a kitchen scale, well, the Princess does. We picked it up so we could translate some of her trans-Atlantic recipes. If it works on flour and sugar, it will work on yarn.
The back weighs 7.5 ounces. The sleeves weigh 9.4. The remaining yarn?9.6 ounces. That's close. That's really, really close. I could just make it. Or I could just miss.
Know what I just remembered?
I have the Swatch.
Posted by
Julie McC.
at
11:04 AM
1 comments
Tuesday, September 14, 2010
Celebrate! Celebrate!
Are these the best candles or what? (Well, they are if you know his favorite class is Latin.)
Posted by
Julie McC.
at
5:46 PM
0
comments
Monday, September 13, 2010
The Clean Version
Darn. Drat. Heck.
You know what the trouble with de-cluttering is? Sometimes things disappear.
Dang it. Shoot. Spit.
Their Father's birthday is the end of the month. Given my recent track record, I don't expect to have his sweater finished by then. Okay, maybe I indulged in a few delusions, which is why I went looking for it in the first place.
Nuts. Goldarn. Odd rot it.
I did, however, expect to be able to lay my hands on all the pieces before I made that determination.
Blast. Dad gum. Cheese and crackers.
Posted by
Julie McC.
at
1:23 PM
2
comments
Saturday, September 11, 2010
Which One, Which One
I've reached the point where I need to make a decision time. Sooner than I expected. The Green Shawl has reached the it-takes-forever-to-knit-a-row-while-at-the-same-time eating-yarn-like cup-cakes stage. That ball of yarn is only 2 or 3 inches across. I'm betting it's only got a couple more rows left in it.
I'm pretty sure I need to know what color to make the border.
And whether to add an inner border in black.
Posted by
Julie McC.
at
12:07 PM
4
comments
Monday, September 06, 2010
Going In Circles
The good thing about abandoning projects is that you have something to go to when the current ones pall.
The good thing about being forced to bring 26 years worth of storage into your living quarters is that it makes you pathological about de-cluttering anything and everything you can.
The good thing about de-cluttering is that you have someplace to put the stuff you actually want.
The good thing about having someplace to put the stuff you want is that you can find things again.
Like the long lost skein of yarn I needed for the Green Shawl.
Which is why it got abandoned in the first place.
Posted by
Julie McC.
at
11:24 AM
0
comments
Thursday, September 02, 2010
Playing With Color
Way back when, at last year's Stitches, I bought these from Tess Designer Yarns for a gift afghan/housewarming present. When I figured out that the bulky variation wasn't going to work, I switched the yarn from 4 skeins of bulky to 4 skeins of worsted weight. Ever since I knew the worsted yarn wouldn't pan out for the afghan, either, I've been looking for another project for it. Otherwise I have to count it as stash, and I have a lot of it. Trading bulky for worsted resulted in a lot more yardage (570 yards per skein compared to 115). That much yarn kind of sings crochet to me.
Once again proving my firm grasp of the obvious, let me note that stripes mean more than one color. The Tess green is a given, but the pattern calls for four colors altogether. I'm thinking about Dream in Color Classy in China Apple. I'm debating between the Copper Penny Madelintosh DK and the Dream in Color Classy in Gold Experience. I'm wondering if Dream In Color November Muse would bee too dark. Maybe I should use up some of my Madelintosh DK in Turquoise. Maybe I should use five colors.
Posted by
Julie McC.
at
12:24 PM
0
comments
Monday, August 30, 2010
Two Weeks
So now I'm more or less up to date on the knitting front, I feel free to admit that the high point of the summer -- pause for dramatic effect -- has not, in point of fact, been knitting. It's been Our Company.
There was the getting ready of course, a summer's worth of it, but rather than go into that in exhausted exhaustive detail, let me, like Inigo, "sum up." First, the 3 deep 6 high incursion of storage boxes that has dominated my dining room since Last October(!) has been reduced to 3 boxes of recycling and 6 boxes of shred-first-then-recycling (All right, so the wall in my bedroom is now home to a 6 x7 row, but it's just a single row. There may be a few odd ones tucked stacked into corners). Secondly, we discovered the source of our chronic hanger shortage - they were nesting in the back corner of the Boys' Closet, unbeknownst to us because we haven't been able to get much beyond a foot on either side of the closet door for years. Let it suffice to add that the lists were impressive, and that we managed to get everything done and crossed off except for the two items at the top of List #2 that we could never decipher.
This is supposed to be a (mostly) knitting blog, so let me focus on that a little. There was Stitches Midwest, of course, but I'll save that for later. She knit and finished one project while she was with us, which means she pretty much knit every day she was here. She has a good start on her top-down model sweater from the Stitches class she and The Princess took. She may not be leaving us as a knitting convert -- I'm pretty sure she thinks we're a little mad, albeit in a nice way -- but that triumph of finishing a first knitted object is a pretty powerful thing.
So now it's the last day of Our Company. The word that comes to mind is "delight." The Princess, the Lord Protector and Their Father all approved her long ago. It was only two weeks, yet she slipped into our lives like she had a place waiting for her, a spot that was empty that we hadn't known about until it was filled. And yes, I know she's leaving today, but her place will remain intact, occupied.
Last night, she asked if she was a knitter now. We said that was for her to say. But we gave her knitting needles and a project bag for a going away gift.
Posted by
Julie McC.
at
3:07 PM
1 comments
Friday, August 27, 2010
A Disturbance in the Space/Time Continuum
That's the only possible explanation for the lack of blogging going on here. I've got three, count 'em, THREE more posts, all written over the past few weeks, waiting for photos. I'm going to finish them up today and publish them all in one fell swoop. I never do that -- I always post on the same day I write -- but drastic times call for drastic measures. I think I'll even leave them with their original dates. They'll pop up periodically today as I finish them. Anyway, you've been warned.
Just to keep you interested, here's a photo of my souvenirs from Nashville. All from Bliss Yarns.
The clever little bag is a small (because they come in various sizes) Knitsack, local produce from the very talented Erin Lane (it says "tink" on the back). That bigger skein of yarn is blue-faced Leicester fingering/sock, also local produce by Jan Quarles at Daily Fibers (couldn't find a website), colorway #9498. The pretty stitch-markers are even more local produce by the also very talented Tactile Design and Press. I tell you, those Tennessee women are a talented lot.
The smaller skeins of yarn are my very first Koigu, bought with a someday second Barn-Raising Quilt in mind - which at the time I thought might have to happen sooner rather than later because I crashed face-first into a Serious Dye Lot Issue with the Claudia Handpainted Walk In The Woods. That's a story with a happy ending, though, and it involves Stitches, so I'll save it for later.
Posted by
Julie McC.
at
1:15 PM
0
comments
Wednesday, August 18, 2010
Presto Chango
I have been avoiding the decision for way too long, but last night I had the amazing good fortune to be surrounded by a team of young realists. That would be the Princess and her regal counterparts, the Eldest Niece and the Visiting Royalty. The result of our deliberations is that the Oldest Nephew's sweater has to go.
I may have paled at this news. Even gone a little green about the gills. Done some deep, sorrowful and heartfelt sighing. All that frogging. All that yarn reclamation. All that knitting to do again. Not that I mind the knitting. It's the starting from nothing all over that gets me.
Honestly, though, these young women are Thinkers. I'd really like to believe it was me (age and guile), but I'm pretty sure it was their (youth and skill) idea that I do the starting over part before I do the ripping out part. As they pointed out, I have many skeins of the yarn left un-knit. There is no reason why I couldn't cast on with one of the remaining skeins before I actually rip and reclaim. Kind of like knitting two sleeves or two socks at the same time, or the front and the back of a flat knit sweater.
I find myself irrationally cheered by this. It doesn't change anything. The sweater is wrong and will have to be knit over. I find myself taking great solace, though, from knowing I won't be at ground zero when I rip out what is now the largest swatch I have ever made.
As a sort of bonus, I think I can say that I'm pretty confident of my gauge now. Despite my concerns that the knitting was too loose, the fabric of the blocked no-longer-a-sweater looks good. This means I have a 12 inch, 242 stitch swatch - a pretty impressive sample on which to base my gauge. Admittedly I had to recalculate all my percentages a la Elizabeth Zimmermann. What's art without a little angst?
So, in an astounding feat of prestidigitation, albeit not of the "now you see it, now you don't" variety, behold the New Sweater.
That's 2 inches of 2 x 2 ribbing using the new, improved gauge swatch.
Snap. I just realised that I'll have to re-knit the sleeves from point zero as well; no saving the ribbing because 1/3 of 232 is not the same as 1/3 of 242. Good thing The Oldest Nephew's birthday isn't until November (and that there's always Christmas when I blow that deadline).
Posted by
Julie McC.
at
11:39 AM
1 comments
Tuesday, August 10, 2010
Three R's Redux
Um. Yeah. About those gauge issues I mentioned last time. Once I measured the gauge for the sleeves, I took a good look at the body of the sweater. I've been dogged by a vague unease while knitting this project, a sense as I'm knitting of the general looseness of the fabric, a growing suspicion that the loops I'm knitting into feel awfully not-so-tight as they should. I've been ignoring this, because I planned the whole sweater to adjust for the change in my gauge, for going from a flat swatch to an in the round garment. As long as I had the tape measure out, I decided to check.
Everybody knows that knitters purl looser than they knit. This is like the given in a geometric proof, right? Like all triangles have three sides or the sum of the angles in a parallelogram will equal 360 degrees or that Pi is the ratio of the circumference of a circle to the diameter. It's the fixed star in the night sky of knitting. Therefore, if one is going to knit in the round, one's gauge will be tighter.
Not this one's. The body of the sweater measured 46 inches instead of 44.
The Oldest Nephew is not stocky. The Oldest Nephew is not scrawny, either, but he is lean. The decision to knit a sweater with 4 inches of ease was made, in part, to accommodate the incontrovertible fact that the actual sweater would knit up at a tighter gauge. The expectation was that the sweater would eventually measure closer to 42 or 43 inches, not a whopping 46.
In a last ditch attempt to cling to my delusion, I decided to block what I had. Rumor had it that Rowan yarn initially stretches out and then pulls in. Rumor didn't prepare me for the sweater stretching out to 50 inches. It didn't lie, either, because once dry the sweater measured less, just not enough less - 46.5 inches to be precise, which is still Way Too Big.
Apologies to the Oldest Nephew. He'll have to go off to Grad School gray sweater-less. This time the Three R's stand for Rip, Reclaim, Re-knit. Or maybe Rail (as at the heavens), Rend, beRate.
Posted by
Julie McC.
at
11:36 AM
1 comments
Saturday, August 07, 2010
The Three R's
One would think, on an 8 hour drive, that serious knitting would happen. One would expect results. One might, and not entirely unreasonably, expect to show significant progress. So not the case on this Nashville trip.
In part, that's because I did more driving than I expected. I'm not sure if it's that Their Father likes to drive more than he thinks he does, or if he thinks I hate driving more than I do, but as a general rule, once he gets behind the wheel, there's no dislodging him. I anticipated miles of Grey Sweater Knitting for The Oldest Nephew. That's miles of yarn, not miles of road. I did knit for miles of road, just not as many miles as I expected. Factor in the late start thing, so we drove more in the dark on roads that accommodate non-glacier-modified land forms (those caves in Kentucky? They're under hills. Big honking hills. Did you know?), and, well, on-the-road knitting just didn't happen.
The knitting at the conference? Not so much. Jinxed by a sliver of wood that caught the sweater about 3 inches down and sliced through 2 strands of the yarn - enough to make me feel I had to go back and splice. The sweater got traded in for blanket squares.
Once back home, I dealt with that repair (thank you spit-splicing gods)and, still in that delusional place where I would get the sweater done in days, started the sleeves. Then noticed they looked awfully wide for their length.
Through some mysterious concatenation of knitting circumstances, and despite the huge gauge swatch and previous sleeve-in-the-round experience with the Lord Protector's sweater, my gauge on the sleeves is horrendously off, almost a full stitch. I now have a second huge swatch, this one to determine which size wooden DPN's will render a sleeve that is in proportion to the body of the sweater.
The Three R's? They would be Repair, Remeasure, Recalculate.
Posted by
Julie McC.
at
10:21 AM
0
comments
Wednesday, August 04, 2010
Off the Road Again
We're back. Nashville was hilly and beautiful.
And sad and historical.
Stone's River Civil War National Battle Site (A.K.A. Murfreesboro to us Yankees).And surprising.
The Hermitage, home of Andrew Jackson, A.K.A. Old Hickory. Which nick-name he bequeathed to a confusing number of streets in Nashville and its environs (or maybe it's really one multi-directional street).
Posted by
Julie McC.
at
2:01 PM
0
comments
Tuesday, July 13, 2010
Yeah, I Did
To continue (you never dreamed I could milk a grey sweater for three posts, did you?):
I really did lose the original chart. I think it's probably somewhere in my Temporary Storage Locker (formerly known as the Dining Room), but I'm not about to disassemble that fragile ecosystem. I made a semi-valiant attempt, a sort of scratching about the edges of the thing, but determined pretty quickly that I was courting disaster at best. At worst, the EPA would have been all over me.
Then The Nephew had to go and get accepted at Grad School. Shouldn't he have his sweater before he goes? Would a Loving Aunt send him off to the wilds of Higher Education without a sweater? Yes he should. And no, she wouldn't.
The obvious solution was to go back to the sample sweater with which I had been entrusted, check the measurements, pull out the books and start again. Presumably this time I would end up with something I would like - at least well enough that I wouldn't have to lay it aside for months before I could convince myself it was worth knitting.
Behold, Chart #2. On real knitting graph paper, even.
Here was something that would work, I thought. Here was a sweater I would just love to knit. With this chart, Priscilla and Gladys at my side, I could produce a Knitted Wonder. I got as far as knitting the front and back welts. I even achieved the first join.
Then I did that thinking thing again. First, I bought Knits Men Want by Bruce Weinstein (photographed by Jared Flood) and read through it. I quote:
"Rule #2: Men Resist Change. . . . If he's over 15, he's probably got his style locked in - and he likes it."
Then I took a good look at the sweater he had given me. At which point I figured I might as well lose Chart #2.
I can't quite bring myself to knit a fine-gauge, v-neck, grey sweater entirely in K1P1 rib. Is it any surprise, though, that I'm knitting an EZ Hybrid Sweater? For my knitting excitement, this time I think I'll knit saddle shoulders instead of the Shirt Yoke variation.
Posted by
Julie McC.
at
6:14 PM
3
comments
Friday, July 09, 2010
Easy as Pie
First off, let's establish that pie is not easy. Anyone who has ever made pie from scratch will tell you it is a process fraught with danger, a theater of high drama indeed, resulting in a dessert that gladdens the eye and heart or a tough, soggy, bitter-tasting disappointment of no small order. Forget the salt and you're eating mushy fruit in baked wall-paper paste. Don't ask how I know. Hey, I was a newly-wed at the time.
Precisely so, the quest for the simple grey sweater was not without its pitfalls. This is, in part, due to my nature. Just as I can never follow a recipe for pie exactly (I do not approve of skimpy pie filling), I can never make the simple straightforward knitting choice. It seems the path must always be convoluted. Twisty is the only way I know how to go.
Back when all this started, when I began to realize The Nephew was serious, I was fired by ambition. I would do some Real Knitting. I would knit a gansey, or at least gansey-style. With this goal I bought up what I think of as key texts (I can't help it; I was indoctrinated at an early age to research and original sources): Beth Brown-Reisel's Knitting Ganseys, Gladys Thompson's Patterns for Guernseys, Jerseys and Arans, Sabine Domnick's Cables, Diamonds and Herringbone, and Priscilla Gibson-Roberts Knitting in the Old Way. Over the months I added XRX's Arans and Celtics and Alice Starmore's Fisherman's Sweaters.
I am so contrary. None of the patterns pleased me. Or if the pattern pleased me, I didn't like the construction. I wanted to knit the sweater in the traditional method, which meant in the round from the bottom up, split for the front and back yokes, join the shoulders and finally knit the sleeves in the round from the top down. This wiped out the XRX book. I didn't (and don't) like the wide necklines on the Alice Starmore sweaters. The Beth Brown Reisel patterns were mostly for children and women. That left me with Gladys and Priscilla, nether of which was big on actually giving a pattern to knit a whole sweater.
That's okay, I thought, I can be an Intrepid Knitter. I decided to go really traditional and make up my own. I charted out a knit-purl pattern for the yoke that pleased me, planned a welt instead of ribbing for the waistband and studied up on gussets. I had the yarn. I had the swatch. I adjusted for stitch and row count.
Then I set it aside to incubate or marinate or something. And then I lost the chart.
Strawberry rhubarb, anyone?
Posted by
Julie McC.
at
4:52 PM
2
comments















