I Know I Had Them
It's not that it's been a bad week. Neither was the one before, for that matter. It was just one (two) of those "Where did it go and how did it get to be now so fast" weeks. Cross country practice every day after school means a pick-up every day after school. A meeting or two means time prepping. A volunteer obligation - especially one where you've been given a new space -- means, well, moving. Add in that all my new knitting is conspiring against me and I have to admit to a certain reluctance to sit at the computer and chronicle it all.
There's a downside to that, though. The blog is the best way I have ever found to keep track of what I'm doing. So when, for example, I am consumed with the need to knit a baby sweater because someone has joined the ranks of that rarefied and erudite group known as parents of children with Down Syndrome, and when I am convinced said sweater must be complete by Sunday and yet can't find the one essential piece of equipment I want (now that I have finally located a pattern I may be able to knit in about 5 hours) there's no point in turning to the blog to help me figure out where and what I've been knitting, because I haven't written about it. Herewith, then, in an attempt to go backward through my remembering and thus locate my stuff, is an inventory of what I think I have on the needles.
The fourth (or fifth) (or sixth?) attempt at an afghan for my neighbor.
The back of Marc's idea of the ideal men's navy blue cardigan.
My. Look at that. That piece is really close to done, isn't it? I may have to figure out exactly where to place the cables on the front soon.
Fenna.
This is my reward knitting, Sadly, very little of my knitting merits a reward these days.
Not a Wool Peddler's Shawl because it's not red.
This is my frustration knitting. I would have thought I'd made more progress here.
Finally, the current cause of my aforesaid frustration.The I Need It Done Yesterday baby sweater, languishing for lack of my new US 10/6 mm Kollage square needles - the "it" that I know I had, and not that long ago, either. I really need them. The size 9/5.5 mm are giving me 4 spi and I want 3.75. The 10's are not hiding in any of the projects on which I'm working, yet I know I own a pair; I have the empty package.
In the interests of full disclosure, I suppose I have to admit that the I Can't Bear To Send this to Afghans for Afghans If I Can't Get The Knitting Straight blanket is still active, too, if only in the sense that I haven't frogged it yet. No, I really don't care that I find the colors absolutely dreadful, it's the technical aspects that have me in a snit. Enough said. No picture required, right?
So there you have it. I figure if Diane was concerned enough to fabricate a need to stop for coffee the day before yesterday, maybe some of you would like to know why I seem to have decided tearing my hair out while running around like a lemming looking for a cliff was preferable to posting.
I feel like Captain Queeg and the strawberries; I know those needles are here somewhere.
2 comments:
Hmm - we looked at the needles in the dining room. You showed me the very nice, flexible cable. Can't remember if you had them in your hand as you worked the locks of the door on my way out -
Find them yet? Isn't it frustrating?
I remember YarnHarlot talking about missing a dnp. She looked everywhere!!! Turns out she had stuck it behind her ear so she'd know where it was. Hmmm....a little tough to do with size 10.
Post a Comment